CONSTRUCTION OF 3 COMPARTMENT WATER SYSTEM TOILET WITH WASH HAND BASIN, WC TOILET PLUS 8.1 KVA GENERATOR IN EACH OF THE SCHOOLS WITH MOTORIZED BOREHOL
Share
Contract Amount: 9,787,857
Contractor: Mobgal Concept
MDA: Universal Basic Education Commission
Status:
Project Summary
After much enquires, it was discovered that the school name-Ai Alafai Primary School, Surulere does not exist in the list of primary schools in Surulere or Lagos State. School name can be confirmed from http://www.nigeriagalleria.com/Educational/Public- Primary-Schoolsa13.html
Location: Lagos
Project Gallery
Click on the project image to expand it.